To Comment to the FERC:

  • Go to www.ferc.gov  
  • In the "Quick Links" box, click Documents and Filings
  • In the new "Quick Links" box, click FERC Online
  • On the page that opens, click eComment
  • Follow the instructions to register
  • Follow directions for “Hydroelectric License/Re-license Proceedings (P – Project Number),
    • Be sure to use Northfield’s FERC project number, P-2485, to enter your comments.

 To Review Comments already submitted to the FERC:
(N.B.  eLibrary works best with Chrome and Edge browsers.)

  • Go to www.ferc.gov 
  • In the "Quick Links" box, click eLibrary
  • A new page opens showing "Enter Docket Number"
  • Type "P-2485" in that box and a list opens showing all names

 

To Subscribe to Notifications from the FERC:

  • Go to www.ferc.gov 
  • In the "Quick Links" box, click eFile
  • If you have previously registered, fill in your email and password, then click Log In
    • if not, click the New User link and follow the instructions
  •  On the left side, click eSubscription
  • At the top, click Add New Subscription
  • Where it says "Enter Docket Number", type in "P-2485" for Northfield Pumped Storage
  • At the bottom, click Subscribe
  • If you also want Turner's Falls/Cabot Station, repeat last 3 steps, using "P-1889".  Note that since licensing for these projects has been combined, using both project numbers will frequently result in duplicates.


 Thanks to Karl Meyer for some of this information!

 

© 2018 Greening Greenfield • c/o 34 Pierce St, Greenfield, MA 01301 • 603-477-3527 • Contact Us: info@greeninggreenfieldma.org